hi all of you,

I haven’t idea if the following description is a issue or not, anyway:

I begin from Control Flow layer.

I’ve created a sequence container and inside I’ve got two groups, one own a sql task and another one own a Data Flow task. Both are linked for a completion conector. Up to here everything is fine. But when I collapse my sequence container the arrow remains there for these tasks and you can see the sequence container “closed” and the arrow lonely.

Not very esthetic, not practical.

Any clarification or though will be as usual welcomed

I've seen similar problems in the past. I think this is termed a "ghost" - meaning that the UI is getting lost somehow.

The SSIS team will want to know about this so bug it at Microsoft Connect with a screenshot! And if you post a repro - even better!

-Jamie

|||

hi Jamie,

Well, at first if you collapse both groups and then the sequence container the arrow is not visible at all..

f..stuff

|||

I don't doubt it. These things are hard to reproduce and we shouldn't try and explain why they happen. If you can repro it on demand tho - you should bug it.

-Jamie

|||

Maybe the problem is that we're assuming that BIDS have capabilities such as the ones that shows VISIO or something like that. Error.

see you

|||

Did you raise the bug?

|||No, laziness